Design Section

The Santa Barbara County Flood Control & Water Conservation District provides for the control of flood and storm waters countywide as well as the conservation of such waters for beneficial and useful purposes. The Design Section of the Flood Control District designs and performs construction contract administration for flood control capital improvement projects located throughout the County. In addition, the Design Section addresses disaster rehabilitation and routine maintenance rehabilitation projects.


To View Current Projects out to Bid,  Click here  


Photos of past Flood Control Projects 

Carpinteria Salt Marsh Enhancement Project (Carpinteria)

Carpinteria Salt Marsh Wall Extension (Carpinteria)

Montecito Creek Debris Basin (Montecito)

El Encanto Debris Basin (City of Santa Barbara)

Lower Mission Creek UPRR Culvert (City of Santa Barbara)

Lower Mission Creek - Reach 1A, Phase 1 (City of Santa Barbara)

Lower Mission Creek - Reach 2B, Phase 1 (City of Santa Barbara)

Montecito Creek Fish Passage Improvements (Montecito)

West Green Canyon Storm Drain Project (Santa Maria Valley)

West Side Storm Storm Drain Phase II (City of Santa Barbara)

Via Rueda Interceptor Storm Drain Phase I (Santa Barbara)

Via Rueda Interceptor Storm Drain Phase II (Santa Barbara)

Gobernador Debris Basin (Carpinteria)

Cheltenham Storm Drain (Santa Barbara)

North Avenue Storm Drain (City of Lompoc)

Santa Maria River Levee Reinforcement Project (Santa Maria)


 

design00

Carpinteria Salt Marsh Enhancement Project
Back to List


design01

Carpinteria Salt Marsh Wall Extension
Back to List


design03

Montecito Creek Debris Basin
Back to List

 
design04

El Encanto Debris Basin
Back to List

 
design06

Lower Mission Creek UPRR Culvert - joint project with the Army Corps of Engineers and Union Pacific Railroad
Back to List

 
design05

Lower Mission Creek - Reach 1A, Phase 1 - joint project with the Army Corps of Engineers
Back to List

 
design07

Lower Mission Creek - Reach 2B, Phase 1 - joint project with the Army Corps of Engineers
Back to List


design08

Montecito Creek Fish Passage Improvements
Back to List

 
design09

West Green Canyon Storm Drain Project
Back to List  

design10

West Side Storm Drain Phase II
Back to List

design18 

Via Rueda Interceptor Storm Drain Phase I
Back to List

  design12

Via Rueda Interceptor Storm Drain Phase II
Back to List

  design14

Gobernador Debris Basin Modification
Back to List

design15

Cheltenham Storm Drain
Back to List 

design16 

North Avenue Storm Drain
Back to List

design17

Santa Maria River Levee Reinforcement Project - joint project with the Army Corps of Engineers
Back to List