Click logo to go to County homepagePlanning and Development Energy Division  
 [  You Are Here:  County Home : Energy Home : ConocoPhillips ]
Site Search
Contact Us
 Energy Division Home
 Announcements
 Who We Are
 Oil & Gas Facilities Map

Projects
American Ethanol
Arco-Alegria
Arco-Dos Pueblos
Chevron-Aera
ConocoPhillips
E&B Resources
ExxonMobil
Gaviota Terminal
Abandonment

Greka
<empty> Hercules
Lompoc Wind Energy
Plains Pipeline, L.P.
PXP Pt. Arguello
PXP Tranquillion Ridge
<empty>& Pt. Pedernales
<empty> Southern Calif. Gas Storage
<empty>Enhancement Project
Sunset/ExxonMobil
Vahevala Project
Texaco
Unocal-Battles
Unocal-Pt Conception
Venoco Ellwood
Onshore Facility

Venoco Full Field
Development

<empty> Venoco Line 96 Project
Venoco SLC 421

 Permit Compliance
 Policies, Rulemaking
 Mitigation Programs
 Interagency Activities
 Information
 Links to Other Sites
 Website Page Links
end-section divider

In case of an oil
spill or gas release:

Call 911


Facility Operators
must also call:

Governor's Office of
Emergency Services
1-800-OILS-911


Energy Division
(805)886-7165


Click here for other
reporting requirements



Click here for normal
business hours contacts
 

ConocoPhillips


ConocoPhillips's Sisquoc Pump Station


What's New

An annual SSRRC safety audit was completed on November 3, 2009.


Description

A pipeline system that transports sales-quality crude oil to the Tosco Upgrader Refinery near Nipomo in San Luis Obispo County.

Location

The ConocoPhillips Pipeline system transports crude oil from the Sisquoc Pump Station westward to the Santa Maria Pump Station and onward out of the County. A segment of this pipeline system transports crude oil from the Lompoc Oil & Gas Plant westward out of the County.

Onshore Facilities

Pipeline Segments:

  • Section from the Lompoc Oil & Gas Processing Facility to the Santa Maria Refinery
    • Crude oil transport is limited by Santa Barbara County permit conditions to 36,000 barrels per day (bpd).
  • Line 300 from the All American Pipeline (AAPL) at the Sisquoc Pump Station to the Santa Maria Refinery via the Suey Junction.
    • Crude oil transport is limited to 84,000 bpd
    • Flow is allowed from the AAPL at the Sisquoc Pump Station to Summit Station (via Suey Junction), but not in the reverse direction.
  • Line 300 from the Summit Pump Station in southern San Luis Obispo County to the location of the former Avila Pump Station, also in San Luis Obispo County.
    • Crude oil is sent northward to the Santa Maria Refinery.
  • Lompoc Facility to Orcutt Station
    • 12-inch diameter pipeline
  • Orcutt Station to Suey Junction
    • 8-inch diameter pipeline
  • Suey Junction to Summit Station, two pipelines:
    • 8-inch diameter pipeline
    • A combination 10- and 12-inch diameter pipeline
  • Summit Station to Santa Maria Refinery
    • 10-inch diameter pipeline
  • Sisquoc Station to Santa Maria Station
    • 12-inch diameter pipeline
  • Santa Maria Station to Suey Junction
    • A combination 10- and 12-inch diameter pipeline
  • Suey Junction to Santa Maria Refinery via Summit Station, two pipelines:
    • An 8-inch diameter pipeline
    • A combination 10- and 12-inch diameter pipeline (same as discussed above for Suey Junction to Summit Station)

Product Distribution

Crude Oil (from Nuevo Energy Co. and Arguello, Inc.)

  • Distributed via pipeline, as follows:
    • From "Line 400", an 8- to 12inch diameter, unheated pipeline; to a
    • Connection with two 8-inch diameter pipelines near the City of San Luis Obispo; then
    • Northward to the ConocoPhillips Rodeo Refinery in the San Francisco Bay Area

Past Activities

  • Visual safety inspection and records audits were performed by SSRRC member agencies on November 13, 2007 for all ConocoPhillips facilities. Overall, the facilities are well maintained.
  • On August 2, 2007, the Energy Division issued a Time Extension of a Land Use Permit to Sisquoc Pipeline Bi- Directional Flow project located at 1580 E. Battles Road, Santa Maria (07TEX-00000-00011). This Land Use Permit will expire on February 10, 2009 unless the use for which this permit was issued has been established or commenced, in conformance with the effective permit. If after February 10, 2009, the use has not been established or commenced, new permits will be required. 
  • On February 10, 2006, Planning & Development issued a Land Use Permit (Case no. 06LUP-00000-00080) to allow the existing Sisquoc pipeline to operate in two flow directions between Suey Junction and the Sisquoc Pump Station.
  • A land use permit was issued on March 21, 2005 allowing for two previously approved requests for an increase in pipeline throughput. The maximum allowable throughput increased from 40,000 barrels per day 84,000 barrels per day for two pipeline segments; the Sisquoc Pump Station to the Santa Maria Pump Station and the Santa Maria Pump Station to the Summit Pump Station

 